# Drywall Calculator — Sheets, Mud, Tape, Screws and Cost > Work out drywall sheets, joint compound, tape, screws and corner bead for a room, with doors and windows deducted, the wall layout drawn to scale and a printable list. Free, no login. ## Pages - [Drywall Calculator: Sheets, Mud, Tape, Screws and Cost From One Room Measurement](https://drywall-calculator-b46.pages.dev/): Work out drywall sheets, joint compound, tape, screws and corner bead for a room, with doors and windows deducted, the wall layout drawn to scale and a printable list. Free, no login. - [Drywall Installation Cost Calculator: Panels, Labour and the Ceiling Premium](https://drywall-calculator-b46.pages.dev/drywall-installation-cost-calculator/): Split a drywall job into panels, labour and a ceiling premium, at your own rates, and see the cost per square foot and how much of the bill is labour. No national averages. - [Drywall Finishing Cost Calculator: What Each GA-214 Level Actually Buys](https://drywall-calculator-b46.pages.dev/drywall-finishing-cost-calculator/): Compare the six GA-214 finish levels on the same wall: what each one includes, where it is specified, and what the extra coats do to the finishing cost at your rate. - [Drywall Repair Cost Calculator: Patch Sizes, Hours and the Trip Fee](https://drywall-calculator-b46.pages.dev/drywall-repair-cost-calculator/): Price a drywall repair by hole size: what each patch needs, the hours it takes, and the DIY material cost against a handyman trip fee plus hourly rate. - [Drywall Sheet Calculator: Which Panel Size and Which Way Round](https://drywall-calculator-b46.pages.dev/drywall-sheet-calculator/): Compare 4x8, 4x10 and 4x12 drywall panels laid horizontally or stood vertically on your own walls: panels needed, joint length, and which one leaves the fewest joints. - [Drywall Square Footage Calculator: Wall by Wall, With the Openings Taken Out](https://drywall-calculator-b46.pages.dev/drywall-square-footage-calculator/): Add up drywall square footage wall by wall with a ceiling and per-wall doors and windows deducted, in square feet and square metres, with the arithmetic shown. - [Drywall Mud and Tape Calculator: Compound, Tape, Screws and Corner Bead](https://drywall-calculator-b46.pages.dev/drywall-mud-and-tape-calculator/): Turn a board area and a joint length into pails of joint compound, rolls of paper tape, pounds of screws and sticks of corner bead, with the coverage assumption shown. ## How the numbers are made - Panel counts come from a per-wall layout: rows = ceiling(wall height ÷ 4 ft), columns = ceiling(wall width ÷ panel length), not from area ÷ panel area. The area division is printed beside it for comparison. - Joint length is measured: a horizontal seam spans the wall width, a vertical seam spans one panel course, and any seam crossing an opening is shortened by the opening. - Sheets are recommended by fewest joint feet, with ties going to fewer panels and then to the smaller sheet. - Compound = board area ÷ 1,000 × a per-level coverage rate (default 4.5 gal at Level 4, editable). This is a job estimate, not a manufacturer figure. - Tape = joint feet + inside corner feet, divided by the roll length (75 ft default, matching the roll a manufacturer’s calculator lists). - Screws = panels × screws per panel from the fastener schedule: 4 stud lines across 4 ft at 16 in on centre, at 16 in spacing on walls and 12 in on ceilings. - Corner bead = outside corner feet ÷ bead stick length, rounded up. ## Facts this site asserts - Panel face area: 32 / 40 / 48 sq ft (CertainTeed — Drywall Calculator) - Panel thicknesses modelled: 1/4, 3/8, 1/2, 5/8 in (Georgia-Pacific — gypsum product catalogue) - Tape roll: 75 ft (Georgia-Pacific — Drywall Calculator) - Waste allowance: 10% default (Georgia-Pacific — Drywall Calculator) - Screws per wall panel: 32 for a 4 × 8 sheet (arithmetic or an editable default) - Screws per ceiling panel: 42 for a 4 × 8, 60 for a 4 × 12 (arithmetic or an editable default) - Inside corner tape: one tape length per foot of inside corner (Gypsum Association — GA-216-2024, Application and Finishing of Gypsum Panel Products) - Outside corner bead: 8 ft or 10 ft lengths (arithmetic or an editable default) - Level 0 finish: no tape, no compound, no bead (Gypsum Association — GA-214, Levels of Finish for Gypsum Panel Products) - Level 5 finish: Level 4 plus a full skim coat (Gypsum Association — GA-214, Levels of Finish for Gypsum Panel Products) ## Notes - No account, no upload, no advertising code, no third-party scripts. - Not a code authority: the panel label, the listed assembly and the local building department decide. - Every price is an example the visitor edits. No national averages are published.